Bathroom renovations
Bathroom fitters for Glasgow's Southside
Full renovations, wet rooms, en-suites and awkward little box rooms. We strip it out, sort the plumbing, tile it and fit it, then leave it spotless. One local team, one point of contact, start to finish.
- SNIPEF
- WaterSafe
- SNAZ
- ISO 9001
- ISO 14001
- Open 7am–10pm, 7 days
Bathroom types
Pick your bathroom
Each one has its own challenges. Here's how we handle them.
Plan your bathroom
Takes about a minute
What's the job?
Pick the one closest to what you're after.
How it works
From survey to last tile
- 1
Survey
We come out, measure up, check your water pressure, waste routes and floor, and talk through what you want. The visit is free.
- 2
Design & price
You get a written quote listing exactly what's included. We help you choose the suite, tiles and fittings if you want a hand.
- 3
Strip-out & fit
One team does the lot: strip-out, plumbing, boarding, tanking, tiling and fitting. You'll know which days the water is off.
- 4
Final finish
Everything tested, sealed and cleaned. We walk you through the room, and the work is covered by our 12-month labour guarantee.
One team, rip-out to last tile
Most bathroom horror stories start with too many trades. The plumber blames the tiler, the tiler is waiting on the joiner, and you're boiling a kettle to wash your hair for a month. We run the whole job ourselves: strip-out, first-fix plumbing, boarding, tanking where it's needed, tiling, second fix and the final clean. You get one number to call and one person who knows where everything is at.
Southside Plumbing was founded by Adam Watson, and bathrooms are the work we like best. We're members of SNIPEF and WaterSafe, and we hold SNAZ, ISO 9001 and ISO 14001 accreditation. That matters on a bathroom because almost everything you can't see once the tiles go up is plumbing: supply pipes, waste runs, joints and valves. Get those right and the room looks after itself for years.
How a bathroom job runs
It starts with a free home survey. We come out, measure up, check the water pressure, look at where the waste can run and take a proper look at the floor and walls. Bring your Pinterest board, your brochure pages or just a list of what annoys you about the current room. We'll talk through what's possible in your space and what it's likely to involve.
Next you get a written quote that lists what's included, so you can compare it properly. Once you're happy, we agree a start date and a rough order of works, and we help you pick the suite, tiles and fittings if you want a hand. Materials are ordered before we start, so the job doesn't stall halfway while a basin is on back order.
On site, a standard refit typically takes a working week or two. Wet rooms and jobs that move the toilet or rebuild a floor take longer, because tanking and adhesives need time to cure and there's more to build. We'll give you a realistic timeline at the survey and tell you straight away if anything behind the old tiles changes it. On the last day we test everything, clean up, and walk you through the new room.
What's included
A full renovation from us normally covers protecting your floors and the route through the house, stripping out the old suite and tiles, and taking the waste away. It also covers any new or rerouted supply and waste pipework, making good or re-boarding walls, tanking wet areas, and wall and floor tiling. Then we fit the new suite, shower, taps and accessories, silicone and grout everything, and test it all.
If your job needs electrics (a new extractor fan, lighting, a shaver socket or an electric towel rail), that work has to meet the wiring regulations and be done by a qualified electrician. We'll organise it as part of the job so you're not chasing another trade. Underfloor heating, heated towel rails and built-in storage can all be added. Just tell us at the survey.
Every job is covered by our written 12-month guarantee on labour, and parts and fittings carry the manufacturer's warranty. It's in writing, so there's no argument about it later.
Southside homes, Southside problems
Bathrooms on the Southside aren't one-size-fits-all. A top-floor tenement flat in Shawlands has a different set of problems from a 1930s bungalow in Giffnock or a family house in Newton Mearns with three bathrooms to sort. In a tenement you're usually tied to a shared soil stack, the floors are timber on old joists, and the walls might be lath and plaster on one side and solid sandstone on the other. In an interwar bungalow the bathroom is often small and squeezed next to the kitchen, with pipework that has been patched by three different owners.
We know these houses, and we know where the surprises usually hide: old lead or galvanised pipe, floors that need levelling before anything can be tiled, and waste runs without enough fall. We'd rather find them at the survey than halfway through your job. If something does turn up once the old room is out, we stop, show you, and agree the fix before we carry on. No surprise extras on the final bill.
Getting ready and living with the work
Clear the room and the route to it, and find somewhere else to keep your toiletries for a week or two. If it's your only bathroom, talk to us early. We can often plan the job so the toilet is back in action at the end of each day, or so you're only without it for a short spell. We'll also tell you when the water will be off.
Choose your suite, tiles and taps early. Lead times vary, and a bathroom that starts with everything on site runs far more smoothly than one waiting on a delivery. If you're not sure where to start, tell us the look you're after and your budget, and we'll suggest options that suit the room.
In a tenement, it's worth giving your neighbours a heads-up about noise and deliveries through the close. If a skip has to go on the street, it needs a council permit. We'll tell you if your job needs one and can arrange it.
Projects
The kind of bathrooms we do
Real before-and-after photos of our own jobs are on the way. We'll never pass off stock photos as our work.
FAQ
Bathroom questions
How long does a new bathroom take to fit?
A standard refit typically takes a working week or two on site. Wet rooms, moving the toilet or rebuilding a floor take longer because there's more to build and tanking needs time to cure. You'll get a realistic timeline at your free survey.
Do you do the tiling and electrics, or do I need other trades?
We handle the whole job: strip-out, plumbing, boarding, tanking, tiling and fitting. Any electrical work has to be done by a qualified electrician to meet the wiring regulations, and we organise that as part of your job, so you only deal with us.
Can I supply my own suite and tiles?
Yes. Plenty of people do. We'll check what you've picked will fit the space and work with your water pressure before you order, and we'll quote for fitting only. If you'd rather not deal with it, we can source everything for you.
Is the home survey really free?
Yes. We come out, measure up, check your pressure, waste routes and floor, and talk through options. There's no charge for the visit.
Can you move the toilet or the shower to a different wall?
Often, yes, but the toilet is the tricky one. It needs a big waste pipe with enough fall to reach the soil stack. In tenements and upstairs flats that can limit where it goes. We'll tell you at the survey what's realistic in your room.
What guarantee do I get?
All workmanship is covered by a written 12-month guarantee on labour. Parts and fittings carry the manufacturer's warranty, which varies by product.
Which areas do you cover?
We're based on the Southside and cover Shawlands, Giffnock, Newton Mearns, Clarkston, Cathcart, Pollokshields, Newlands and Busby, plus the rest of Greater Glasgow.
Areas
Bathroom fitters across the Southside
Ready for a better bathroom?
Tell us what you're after in a few quick taps. Adam will call you back to arrange a free home survey.
Open 7am–10pm, 7 days.